Camec Down Light LED Long Lead – Suits Camec 040864 Range Hood

$29.00

2 in stock

SKU: 041751 Category:

Description

Camec Down Light LED Long Lead – Suits Camec 040864 Range Hood

Replacement LED down light with a long lead, specifically designed to suit the Camec 12V Range Hood (040864). Offers energy-efficient performance, long-lasting durability, and easy installation.

Lead approximately 70cm.

Diameter 67mm.